Olympic View

image of Uploads

2012 - Installed new energy-efficient single zone air handling units with associated duct and diffusers. Replaced existing ceiling tile. Install new energy-efficient light fixtures.

2011 - Removed existing ADA access ramp and stairs to playground structure. Installed new concrete ramp and stairs. Installed new concrete curb around play structure and new wood chips. Installed field drainage system and repaired irrigation system in the playfield. Replaced topsoil and grass on playfield. Installed new heat pump in the boiler room and made limited HVAC upgrades to the second floor.

2009 - Computer network upgraded to fiber optic, enhancing students’ and teachers’ ability to use technology as an educational tool.