Northgate

image of Uploads

2011 - Replaced existing boiler with two new condensing boilers for improved energy efficiency. Installed new circulation pumps. Connected new equipment to existing direct digital controls.

2010 - Replaced floor tiles. Installed energy-efficient windows. Upgraded mechanical systems. 

2009 - Computer network upgraded to fiber optic, enhancing students’ and teachers’ ability to use technology as an educational tool. 

2006 - Waterline replacement

 

Back to BTA II