Montlake

image of Uploads

2011 - Upgraded library with new shelving, new checkout desk, ceiling-mounted video projector, repainted walls and refinished flooring. 

2009 - Flooring was replaced in the offices and cafeteria. Water-damaged flooring in one classroom was also replaced. Composite rubber flooring replaced the water-damaged floor of the gymnasium. Ceiling tiles and lights in halls and cafeteria were replaced. New window shades were installed in portables, cafeteria and gym. New electric heaters replaced the oil stoves in two portable classrooms.

Back to BTA II