2012 - Installed new energy-efficient single zone air handling units with associated duct and diffusers. Replaced existing ceiling tile. Install new energy-efficient light fixtures.

2011 - Replaced steam boiler with a new energy-efficient boiler including new controls. Replaced water heater. Converted water heater and boiler to natural gas. Replaced air-handling units. Installed heat recovery system. Replaced fire alarm. Replaced ceiling tile, and installed new lighting.

2009 - The Special Education classroom gained a new rubberized play area and door thresholds that are compliant with the Americans with Disabilities Act (ADA). Other projects included - asphalt playground seal coating and restriping, replacement of library window roller shades.