Broadview-Thomson

image of heroes

2012 - Replaced boiler burners and hot water heaters to improve energy efficiency.

2011 - Installed energy-efficient heating controls. Installed water meter. Upgraded gym lighting fixtures.

2010 - New flooring. Roof replacement. Heating system upgrades. Upgrades to comply with Americans with Disabilities Act (ADA).

2009 - Replaced floor tiles in hallways and cafeteria. Carpet replaced in one classroom. New roller shades added to windows throughout the school. New ceiling tiles and lights installed in the cafeteria using a new ceiling system.

Back to BTA II