Adams

image of heroes

2012 - Installed lighting controls and energy-efficient gym light fixtures; installed pathway lighting.

2009 - Worn out carpet in the library and offices was replaced. The school’s public address system was replaced and a new stage drape was installed. Roller shades replaced window blinds throughout the building, allowing better light and heat control in classrooms. Mechanical improvements included a new kitchen water heater, electrical panel replacement and replacement of an inoperative sink unit in the staff room.